Geneseo High School

Posted by Flyhouse on Dec 1, 2017 10:00:00 AM

Geneseo High School provided Flyhouse with an opportunity to do something unique - build doors at the back of the stage to allow for major scene changes in a limited-wing space theater allowing for more to be done on stage. Flyhouse also installed nearly two dozen dead hung line sets and 11 ETC Prodigy Hoists.

Topics: Project Recaps

United Center - Motorized Grids

Posted by Flyhouse on Nov 17, 2017 8:45:00 AM

United Center Grid 1.jpg

United Center Grid 20.jpg

United Center Grid 39.jpg

United Center Grid 6.jpg

Topics: Project Recaps

Flyhouse Training

Posted by Flyhouse on Nov 13, 2017 4:12:58 PM

Flyhouse just launched a training website to detail the training classes we have available with the most knowledgeable trainers currently working in the industry. Take a look and see if it's something you'd be interested in seeing in action.

Topics: Flyhouse Team, Training

Cable Terminations

Posted by Flyhouse on Oct 27, 2017 11:16:11 AM

When using terminations on cables, Flyhouse wanted to test whether the ratings provided were correct and hold up like they should. Let's head to the shop to see what we found out.



Click here to watch this video on YouTube

Topics: Flyhouse Team, Video

Little Caesars Arena

Posted by Flyhouse on Oct 27, 2017 12:00:00 AM

In the new home of the Detroit Red Wings and Pistons, Flyhouse installed over 100,000 square feet of horizontal and vertical acoustical lapendary panels along with the upper masking, half-house, and blackout curtains for the entire arena.

Topics: Project Recaps