Chicago Flyhouse Blog

Elgin Community College Gets a Lift

Posted by Flyhouse on Sep 11, 2019 3:01:28 PM

Arts Center Updated Ahead of 25th Anniversary

Flyhouse’s Safer Venue service provides customers with comprehensive annual inspections and repairs. Nobody likes major repair work or safety incidents that could have been prevented—yearly maintenance is a must. 

The Elgin Community College Arts Center’s recent Safer Venue Inspection identified several rigging issues that needed to be addressed. Flyhouse is always inventing better ways to make rigging systems operate smoother and safer, and our annual venue visits provide the opportunity for improvements and updates. 

ElginCC_Pics

 

 

 

 

 

 

 

 

 


In addition to regular maintenance, Flyhouse was also awarded a larger renovation project at the Art Center; its scope was designed by theater consultant Bill Connor Associates, LLC. The project included the installation of nine custom ZipLift counterweight assist hoists with a custom head block, which allowed the powered hoist to easily retrofit into their existing system. This newly designed hoist can safely move a lineset up to 1000 pounds out of weight. The orchestra shells that exist at Elgin CC weigh close to 4000 pounds and now with the theater upgrades provided, operators are able to move them by the push of a button instead of hanging on the handline hoping that they move a few inches.

Flyhouse has been moving scenery and performers with our custom designed ZipLift hoists since 1998 and we’re extremely experienced in automating things. Our newest hoist is currently being used at Elgin CC but it’s Elgin's custom control system that makes this project truly unique. In just two weeks, we modified the system to integrate all nine units into one custom cabinet for all of the power and controls. Now all nine hoists are controlled by one pendant while the person is standing anywhere onstage, keeping a line of sight on the hoist-assisted linesets flying these extremely large amounts of weight to programmable trims.

In recent years, the Elgin CC Arts Center has primarily been used for concerts, but now the venue is suited for musical productions and much more. The repairs and updates will be complete in time for the 25th anniversary season which begins this fall. We can’t wait to see how these facility improvements put a little more zip in future Elgin CC productions!

Topics: Hoist, Theatrical Rigging, Flyhouse Projects

No Sweat for Flyhouse

Posted by Flyhouse on Aug 8, 2019 1:54:28 PM

15 Days, Contract to Completion

Photo Jul 21, 9 01 39 PM

Some might think that a seven day lead-time and eight day installation—during an NYC heatwave—for a massive stadium project is a problem. But when Flyhouse was tapped by Far Right Productions to help bring the wildly successful Fortnite World Cup Tournament to life, of course we said yes. For us, it's just another chance at what we do best.

Our experienced crew of rope access techs and riggers installed 68,000 feet of light blocking and sound absorbing fabrics at USTA Arthur Ashe Stadium in Flushing, NY. The fabric, custom sewn by Rose Brands Inc, had to be temporarily installed across the bottom of the roof structure, 185 feet in the air. All the fabric panels were placed carefully and without disruption to the several hundred other rigging points also being installed for the audio and visual portion of the show—keeping the event on schedule. Flyhouse enhanced the environment of the stadium so the light and acoustics were perfectly in sync for this live, televised event. 

Arthur Ashe Stadium, July 2019BY THE NUMBERS 
10,000 ft of tension wire 
12,000 ft of horizontal lifeline 
5,000 snap hooks 
300 steel carabiners 
300 support straps 
23,000+ seats at Arthur Ashe Stadium, filled to capacity all weekend 
100 solo tournament players on stage
16-year-old Fortnite World Cup champion 
$3,000,000 Grand Prize 


It was another unique and challenging project that we got accomplished and an example of why Flyhouse is a leader in the sound absorption and light reduction market. But we got it done, no sweat no problem. Challenge us with your impossible projects … we’re ready to play!

 

Topics: News, Arenas, Flyhouse Projects

Behind the Curtains

Posted by Flyhouse on Jul 26, 2019 10:30:00 AM

Everything you wanted to know about Flyhouse products and services
but were afraid to ask!

Flyhouse_Presentation_Quote_Mark

Chicago Flyhouse is a specialty rigging company primarily servicing the entertainment, multi-purpose venue, retail, church, and museum industries. Our rigging services are diverse. Our reputation is sterling. Our dedication to extraordinary rigging that exceeds industry and safety standards means individualized, innovative designs. Whether permanent or temporary, decorative or practical, for the best, safest, and most personalized rigging available, Flyhouse has the solution.

Big rigging for big venues: Flyhouse Arenas also partners with industry-accepted manufacturers to provide and install acoustic and light control solutions for arena and stadiums, while maximizing efficiency and budget. We pride ourselves on out impeccable quality of work and sterling reputation.

And, our Safer Venue program provides rigging Inspection, Training, Maintenance and Warranty to equip any type of space with a comprehensive yearly safety system.
 


Want to learn even more about some of our Flyhouse products and services? Click on any of the topics below (or above) to download details and specs. Isn't that fly?

Arena Curtains 

Zipcontrol: Black

Zipcontrol: Gray

Zipcontrol: Yellow

Ziplift: Xl

Ziplift: X300

Lux Sonitus

Access Solutions

Topics: Flyhouse Products and Services

Grand Valley State University

Posted by Flyhouse on May 15, 2019 8:29:13 AM

Ready for our curtain call!

Grand Valley State University will be welcoming a new president next month with new curtains in the Kirkhoff Center's largest conference room. Flyhouse installed the two panels which measured 10’6” tall and 36’ wide each, for a total of about 70’ of (IFR) Inherently Flame Resistant fabric Charisma, which never need future maintenance with fire-proofing chemicals. As part of the project, Flyhouse repositioned the curtain track to a more convenient place for overall space usability.  After finding access and moving structure, we re-mounted the brackets that hold the track, modifying existing equipment to allow for a more harmonious space for GVSU's needs. 

Flyhouse_GVSU_Blog

These curtains come at the end of a 3-year project that included a $20 million, two-story, 47,000-square-foot addition to the Performing Arts Center. Flyhouse installed rigging infrastructure, pipe grids and curtains in the new space, which includes a black box theater, lighting design laboratory, and a theatre and dance lab. The building also features multiple music department rehearsal spaces and a percussion room, with Flyhouse-installed acoustic drapes so musicians can hone their skills without too much interference from echoes off the walls. 

GVSU's 220-member Laker Marching Band and various vocal ensembles also use the new center, which opened in fall 2017.

Topics: Flyhouse Projects

2019 Final Four Basketball Tournament with an assist by Flyhouse

Posted by Flyhouse on Apr 3, 2019 9:18:46 PM
In oder to manage light control requirements of NCAA Final Four, Chicago Flyhouse Inc. installed nearly seven miles of fabric at U.S. Bank Stadium in Minneapolis, Minn ahead of the championship games that begin this Saturday, April 6.
 
Flyhouse partnered with Rose Brand to fabricate inherently flame retardant synthetic velour, which Flyhouse hung around the perimeter of the 1.75 million square foot venue. The lightweight blackout liner and pewter-colored fabrics were selected to draw minimal attention to curtain systems used throughout the stadium. 
 
One curtained section required a drape that measured over 63,000 square feet—enough to cover 14 basketball courts.
 
Flyhouse also designed and fabricated a proprietary and fully networked chain hoist control system, which reduces the overall cable and power requirements at the stadium. The semi-permanent motorized truss system gives U.S. Bank Stadium an easy-to-use lightweight control system for future events.
 North Clerestory from Court-1
 
“We are honored to work with U.S. Bank Stadium and the NCAA Final Four on such an iconic national sports event,” says Flyhouse founder Mark Witteveen. “This is an example of what Flyhouse does best: taking unusual requests and impossible problems and turning them into extraordinary solutions.”
 
The entire project took approximately eight months and required custom design drawings, system mock-ups, and engineering review. 
 
Flyhouse was also contracted by the Minnesota Sports Authority to add an additional 67,000 square feet of acoustic drapery to improve the stadium’s sound quality for upcoming events.
 

Topics: Flyhouse Projects