Southeast Area Elementary is a new school in the southeastern section of Chicago. The three-story, 110,000 square foot building is able to house 1,200 students with 44 classrooms to accommodate them.

As part of the new construction, a stage and theater area was designed on one-half of a gymnasium, where performances and other events were able to take place.

Flyhouse was brought in to install 18 dead hung line sets with travelers and a curtain system.

Installing a dead hung line set system is a fairly standard project where steel pipe battens, suspended by a chain, have the ability to hang curtain tracks, lights or other items needed for a performance.

Southeast Area Elementary (Chicago)

During the installation process, Flyhouse’s team observed the roof in the gymnasium where the line set system was to go had a noticeable and challenging slant. In order to complete the install, Flyhouse needed to discover a technique to the counter the slant and still get the job done on-time.

By hanging supplemental steel that countered the unusual structural steel hung above the stage, a standard hanging grid was fabricated so that the usual hanging points for standard line sets were created. Our full custom fabrication shop lets us meet challenges like these as we can take any and all forms of steel and aluminum to meet all structural challenges.

Flyhouse was able to make installation a success and exited stage left to another project before the lights came up on the first performance.

 

Topics: Rigging System, Flyhouse Projects

Subscribe to Email Updates

Follow Me

Hoist School 2017

This week we have the honor of having two Flyhouse team members as instructors at the 32nd Annual Columbus McKinnon Hoist School hosted by Mountain Productions in...Read more

Rehabilitation Institute of Chicago Ability Lab: Part One

The Rehabilitation Institute of Chicago (RIC) is a world-renowned medical center that specializes in the treatment of patients with debilitating issues through a model of integrated research,...Read more

Flyhouse Rigging Fact - Batten Loading for Uniform Loads
Chesapeake Arena Project Recap

After breaking ground at the turn of the century, Chesapeake Energy Arena opened its doors to the public in 2002. The 586,000-square foot arena is currently home to the NBA Oklahoma City Thunder...Read more

Performer Flying Rehearsal

The House Theatre of Chicago wrapped up their rehearsals at Flyhouse's shop this week before moving over to the Chopin Theatre to start production. They are making performer flying look...Read more