Chicago Flyhouse Blog

Next Stop: Detroit

Posted by Flyhouse on May 12, 2017 9:14:14 AM

The Motor City. Birthplace of Motown. Home to the only floating Post Office in the U.S. Call it what you want, but Flyhouse is setting up shop for a few months in Detroit for a new arena project.

The Little Caesar’s Arena, scheduled to open September 2017, will serve as the new home of the Detroit Red Wings, Detroit Pistons, and other entertainment events.

By the time the puck drops for the Red Wings, Flyhouse will have installed over 100,000 square feet of horizontal and vertical acoustical lapendary panels along with the upper masking, half-house, and blackout curtains for the entire arena.

Make sure to follow our Facebook and Instagram pages to see updates on all Flyhouse projects happening.  

Little Caesars Arena

(Photo Credit: Olympia Entertainment)

Topics: Acoustical Baffles, Acoustical Curtains, Flyhouse Projects, Arenas

[Project Recap] St. Viator High School Acoustical Drapes

Posted by Flyhouse on Aug 8, 2016 8:30:00 AM

Tucked away in the suburbs of Chicago, Saint Viator High School is a Catholic secondary school with approximately 1,000 students. The building, originally established in 1961, remained virtually untouched over the years until the 1990s when a series of building upgrades took place.

In recent years, another round of upgrades took place. As part of the upgrade, Saint Viator High School wanted to improve the acoustics of both their choir and band room. While the rooms were functional and provided the needed resources for the choir and band, the sound quality needed a slight adjustment.

St_Viator_High_School.png

In order to accomplish this, Flyhouse installed three manual acoustical drapes on the walls of the rooms. Also as part of the acoustic assistance, a manual bi-part, 25oz thick Charisma Rose Brand acoustical curtain was installed. The curtains hang roughly 10’ above the finished floor and had to be adjusted during installation due to an already installed HVAC system in the room.

While Flyhouse wasn’t around for the first rehearsal after the installation, we are certain the sound quality was impressive.

Topics: Acoustical Curtains, Flyhouse Projects

Subscribe to Email Updates

Follow Me

Columbus McKinnon 5-Day Mega School

Flyhouse's Director of New Product Development, Eric, will be one of the lead instructors for this year's CM Mega School. For more information on his course and how to earn ETCP credits, visit...Read more

Join Flyhouse - Project Supervisor

Flyhouse is hiring for a Project Supervisor. Think you or someone you know would make a good one? Take a look at the position and submit an application so we can talk.   Read more

Three Dead Wraps: The Industry Standard

Dead wraps are wraps of the wire rope around a drum that provide an anchor for the wire rope to the drum. The industry standard has always been three dead wraps, but why is that? Flyhouse went to the...Read more

Flyhouse Projects in October

From flying Billy Elliot, being on-site at multiple Arena projects to installing holiday decorations, Flyhouse has a full schedule this October. So where are we? In-Progress Projects Geneseo High...Read more

Why Did the Zip Line Break?

When you were a kid, did you ever try to make your own zip line between two trees? The likelihood of succeeding in this endeavor at that age was probably slim. But do you know why it didn't work?...Read more