The Ronald O. Perelman PAC

November 23, 2021

The Ronald O. Perelman PAC

New York City, New York

Contact Us

Portfolio > The Ronald O. Perelman PAC

The Ronald O. Perelman Performing Arts Center By the Numbers:

9

Linesets

1

Pipe Grid

5,000

Linear Feet of 1/4" 7x19 Wire Rope

9,246

Linear Feet of Roller Chain

13,249

Hex and Nylock Nuts

1,030

Roller Bearings

71

Emergency Stop Buttons

10,000+

Electrical Components

16

Point Hoist

1

Demountable Catwalk

2,800

Linear Feet of 6mm 6x36 Wire Rope

15,170

Rated Bolts

30,942

Pounds of 4x8ft Sheet Steel (92 Sheets)

3,800

Linear Feet of Curtain Track

3

Theaters

2

Portable Point Hoists

34

Acoustic Banners

1,000

Linear Feet of 3/8" 7x19 Wire Rope

23,475

Flat and Lock Washers

52,553

Pounds of Steel Stick Goods (379 20ft Sticks)

626

Engraved Signs

3

EaseTM Controllers

Start Spreading the News: Perelman PAC

The Chicago Flyhouse Inc. team is always grateful to work on familiar projects with longtime clients, and challenging new assignments too. We were particularly excited to be part of this project that kept our team busy during an unprecidented pandemic.

The Ronald O. Perelman Performing Arts Center (PAC) is on the World Trade Center campus in Lower Manhattan, New York. This new 129,000 square foot venue will feature a wide range of dance, music, opera, and theater productions in multiple, flexible performance and public spaces. The PAC is scheduled to open in 2023.

Flyhouse officially joined the PAC project in January 2021 as stage engineering contractor, responsible for the overhead systems (rigging) scope of work. Flyhouse remained in our Chicago shop during the initial months, working on fabrication and testing. Installation and commissioning began onsite in New York that fall, and expected to last 6-8 months.

Footer

  • Home
  • About Us
  • Contact

info@flyhouse.com
773-533-1590

2450 W. Hubbard Street
Chicago, IL 60612

Copyright © 2023 Chicago Flyhouse   |   All Rights Reserved   | Privacy Policy |   Website by AdeptPlus